Come see us at WOC 2025!

Booth S11115

Blog

Integral Color & DAY1 in Tilt-Up Construction


This structure was part of the expansion for the Wells Fargo campus in Chandler, AZ. The expansion included two four story office buildings flanking a three level parking garage. All three structures would utilize tilt-up panels of varying sizes.

To achieve the desired color, the tilt-up contractor used Solomon Colors 288 Buff dry integral color. The pigment created uniform color between batches that would last the life of the concrete. Panels were given light and heavy sandblasts as specified to create different appearances.

The mix used was a high strength, self-consolidating concrete. The self-consolidating mix led finishers to complain about “sticky” or difficult to finish concrete panels. The hot, dry, and windy environment in Arizona also contributed to the difficulty faced when finishing the back sides of the panels. To remedy this, the contractor used DAY1 Finishing Aid. After using DAY1 for several days, the foreman remarked that he witnessed a “90% reduction” in the amount of touch-up required on each panel. Workers were able to more quickly and easily finish the panels with fewer mistakes. This represented a significant labor savings versus sprinkled water, a vapor barrier, or no finishing aid.

Resources

Photo Gallery

Explore impressive concrete installations to find inspiration for your next project.

View Pictures

Videos

Watch our how-to's and product overviews for in-depth information.

Watch Videos

Tech Docs

Find color cards, safety data sheets, architectural documents and more.

View Tech Docs

Color Calculator

Find out how much color and fiber you'll need for any size project.

Ready Mix Calculator

Our Brands